Project Description
Basic and Executive project and extension of the ’ official school of LANGUAGES ’ in TARRAGONA
TECHNICAL SERVICES:
STUDY OF SAFETY AND HEALTH
PROMOTOR:
Management of INFRASTRUCTURE ’, S.A..
ARCHITECTS:
VICTOR REMAINED & FRAMEWORK CONTINUED
BUDGET (P.E.M.):
6.739.880,62 €
SURFACE:
6.815,80 m²
Year of EXECUTION ’:
2007
Description of the ’ WORK:
The building of the former Factory of Tarragona is home to the official school of languages and in order to get them hoes was remodel the existing vertical core (clock tower) in order to size your scale protected and add an elevator.
The project was based on the recovery farm construction. In pretty poor condition general with two areas of floor slabs collection·lapsats and wall of façade and roof damaged and in the construction of ’ a ’ vertical access with elevator rooms/facilities.
Deserves a mention in addition to the recovery of the industrial architecture of the landmark chimney ’.